top of page
proces inwestycyjny

P
 I

INVESTMENT PROCESS

U.jpg

KLIENT

AGREEMENT

A document constituting a contract between the ordering party (investor) and the contractor (designer).

A.jpg

DESIGN

ANALYSIS

Checking the feasibility of implementation, parameters and profitability of the investment.

PB.jpg

PROJEKT

CONSTRUCTION DESIGN

The scope and form of PB depend on the scale of the project. PB is an attachment to the application for a building permit (PnB).

&.jpg

PRAWO

LAWS

The chapter contains a list of laws useful in the investment process.

MI.jpg

CLIENT

INVESTOR MATERIALS

Basic materials that form the basis for design.

KW.jpg

DESIGN

PRELIMINARY CONCEPT

The project is intended to present the idea, architectural form, determine the function and basic parameters of the investment. It constitutes the basis (attachment) to the application for WZiZT.

PP.jpg

PROJEKT

TENDER PROJECT

PP is part of the DP and the basis for selecting the General Contractor (General Contractor) and the investment cost estimate.

&.jpg

PRAWO

REGULATIONS

The chapter contains a list of regulations useful in the investment process.

DP.jpg

CLIENT

TENDER DOCUMENTS

A study to select the GC in the form of a tender.

KZ.jpg

PROJEKT

ADVANCED CONCEPT

The project is intended to determine the architectural form, full functional program and detailed parameters of the investment. It forms the basis of the construction project.

PW.jpg

PROJEKT

EXECUTIVE PROJECT

The scope and detail of the PW is to enable the implementation of the investment.

WA.jpg

URZĘDY

THE FACULTY OF ARCHITECTURE

The chapter contains a list of basic procedures of the architecture department of the city hall.

WŚ.jpg

URZĘDY

DEPARTMENT OF ENVIRONMENT

List of department procedures.

ZD.jpg

CITY OFFICES

ROAD AUTHORITIES

List of office procedures.

BPP.jpg

URZĘDY

List of department procedures.

WG.jpg

URZĘDY

DEPARTMENT OF GEODESY

Lista procedur wydziału.

GM.jpg

URZĘDY

MANAGERS / MEDIA

List of betting procedures:

energy

water supply (MPWIK)

district heating (MPEC).

DP.jpg

URZĘDY

RESTORER

List of department procedures.

NB.jpg

URZĘDY

SUPERVISION

List of department procedures.

© 2011-2024 PROJEKTUJE Michał Marcinkowski.

bottom of page